Photo Galleries

Previous Photo
Photo 3 of 5
Next Photo
Begin slide show
Thanks to some nifty crane work and remote-controlled steering, the heaviest lifting for the new Quechee Bridge has been completed. Workers yesterday used towering cranes on both sides of the Ottauquechee River to move five concrete girders weighing about 42 tons each into the new abutments. Traffic was delayed while the 87-foot-long beams were maneuvered to the construction site on Main Street. The girders were hauled from Middlebury, Vt., on trailers with steerable rear axles, said Rich Menge, Hartford’s public works director. The axles are controlled remotely by someone following the trailer in another vehicle. The bridge, projected to cost $1.8 million, is being built by Windsor-based contractor Miller Construction. It will replace the one that was mangled last August by floodwaters from Tropical Storm Irene. The next steps will include welding the girders in place, Menge said. Water, sewer and utility lines will be placed in the bays between the beams and then a concrete deck poured over it. Periodic traffic delays may occur as work continues, but no long waits are anticipated, Menge said. The new bridge is expected to open next month.
Valley News - Jennifer Hauck
Caption: Thanks to some nifty crane work and remote-controlled steering, the heaviest lifting for the new Quechee Bridge has been completed. Workers yesterday used towering cranes on both sides of the Ottauquechee River to move five concrete girders weighing about 42 tons each into the new abutments. Traffic was delayed while the 87-foot-long beams were maneuvered to the construction site on Main Street. The girders were hauled from Middlebury, Vt., on trailers with steerable rear axles, said Rich Menge, Hartford’s public works director. The axles are controlled remotely by someone following the trailer in another vehicle. The bridge, projected to cost $1.8 million, is being built by Windsor-based contractor Miller Construction. It will replace the one that was mangled last August by floodwaters from Tropical Storm Irene. The next steps will include welding the girders in place, Menge said. Water, sewer and utility lines will be placed in the bays between the beams and then a concrete deck poured over it. Periodic traffic delays may occur as work continues, but no long waits are anticipated, Menge said. The new bridge is expected to open next month. Valley News - Jennifer Hauck Album ID: 1564609 Photo ID: 44713518
Current Specials (If your order qualifies, the most advantageous special for you will be applied at checkout.)
* 20% off 8x10 prints! (Does not apply to framed prints.)
* Get 20% off multiple print orders!
This is a low-resolution representation of a high-resolution photo suitable for print reproduction. If the image displayed above is color - the print will be color. If the image displayed above is black and white - the print will be black and white. This preview does not represent high image quality of the products that can be ordered from this site. Unauthorized reproduction of this image prohibited by law. Watermarks do not appear on the final product.